Scientific Methodology
The workplan of DiCoMo is structured in seven work packages (WP). The interrelation of the work packages is visualized in Pert Chart. WPs 2-5 are covering the elaboration of the individual system components and are flanked by WP 1 for a comprehensive system design and WP 6 for measurements and evaluation on the system level. WP7 is dedicated to the Management of the project. In the following list the work packages and short description are presented:
WP1: Design of x-ray imager
WP2: Backplane development and fabrication
WP3: Core-shell particles
WP4: Frontplane development and fabrication
WP5: System integration
WP6: Imager measurements and evaluation
WP7: Management and dissemination
Figure: Pert chart of DiCoMo.